📢 NOTICE OF AWARD

    1. Distribution Transformers

The Procurement for the Consignment, Supply and Delivery of the 2026-2027 RPH Distribution Transformers Requirements of the Member Electric Cooperatives of Region Three (PB-ITB-R3-1-2025).

This is to inform First Philec, Inc. (“Philec”) that it has passed the Post-Qualification Evaluation for the procurement of the above project under the National Electrification Administration’s (NEA) Regional Procurement Hub (RPH) Program. Thus, Philec is awarded the contract for PB-ITB-R3-1-2025 in accordance with its Total Bid Price, as follows:

📦 AWARDED ITEMS

ITEM NO. DESCRIPTION QUANTITY UNIT PRICE (PHP) TOTAL COST (PHP)
A Transformer, Pole Type, Conventional, 15 kVA, Cu-Al Winding 219 ₱68,418.00 ₱14,983,542.00
B Transformer, Pole Type, Conventional, 25 kVA, Cu-Al Winding 673 ₱80,473.00 ₱54,158,329.00
C Transformer, Pole Type, Conventional, 37.5 kVA, Cu-Al Winding 683 ₱105,347.00 ₱71,952,001.00
D Transformer, Pole Type, Conventional, 50 kVA, Cu-Al Winding 439 ₱115,050.00 ₱50,506,950.00
E Transformer, Pole Type, Conventional, Amorphous, 15 kVA, Cu-Al Winding 377 ₱74,176.00 ₱27,964,352.00
F Transformer, Pole Type, Conventional, Amorphous, 25 kVA, Cu-Al Winding 1,034 ₱94,886.00 ₱98,112,124.00
G Transformer, Pole Type, Conventional, Amorphous, 37.5 kVA, Cu-Al Winding 1,226 ₱113,031.00 ₱138,576,006.00
H Transformer, Pole Type, Conventional, Amorphous, 50 kVA, Cu-Al Winding 834 ₱130,493.00 ₱108,831,162.00
TOTAL BID ₱565,084,466.00

Accordingly, Philec is required to post Performance Securities payable to the Member ECs in accordance with the forms and amounts specified under IB Clauses 21.2 of the Bidding Documents within fifteen (15) days from receipt of this Notice.

Note: Failure to provide the required Performance Securities shall constitute sufficient ground for the immediate cancellation of this award and forfeiture of the Bid Securities.

For complete details click the link below:

RPH NOA – R3 DISTRIBUTION TRANSFORMERS

 

    2. Steel Poles

The Procurement for the Supply and Delivery of the 2026-2027 RPH Steel Poles Requirements of the Member Electric Cooperatives of Region Three (PB-ITB-R3-2-2025).

This is to inform Poleman Metal Structural Corporation (“Poleman”) that it has passed the Post-Qualification Evaluation for the procurement of the above project under the National Electrification Administration’s (NEA) Regional Procurement Hub (RPH) Program. Thus, Poleman is awarded the contract for PB-ITB-R3-2-2025 in accordance with its Total Bid Price, as follows:

📦 AWARDED ITEMS

ITEM NO. DESCRIPTION QUANTITY UNIT PRICE (PHP) TOTAL COST (PHP)
A Pole, Steel, 30′, Bare-4.0mm, 86 Micron, 750kgs (Minimum Load Break) 720 ₱25,998.00 ₱18,718,560.00
B Pole, Steel, 35′, Bare-4.0mm, 86 Micron, 750kgs (Minimum Load Break) 545 ₱32,488.00 ₱17,705,960.00
C Pole, Steel, 25′, Bare-3.0mm, 86 Micron, 500kgs (Minimum Load Break) 710 ₱12,198.00 ₱8,660,580.00
D Pole, Steel, 30′, Bare-3.0mm, 86 Micron, 500kgs (Minimum Load Break) 1,491 ₱20,398.00 ₱30,413,418.00
E Pole, Steel, 30′, Bare-3.5mm, 86 Micron, 1000kgs (Minimum Load Break) 10 ₱29,488.00 ₱294,880.00
F Pole, Steel, 35′, Bare-3.0mm, 86 Micron, 500kgs (Minimum Load Break) 891 ₱24,488.00 ₱21,818,808.00
TOTAL BID ₱97,612,206.00

Accordingly, Poleman is required to post Performance Securities payable to the Member ECs in accordance with the forms and amounts specified under IB Clauses 21.2 of the Bidding Documents within fifteen (15) days from receipt of this Notice.

Note: Failure to provide the required Performance Securities shall constitute sufficient ground for the immediate cancellation of this award and forfeiture of the Bid Securities.

For complete details click the link below:

RPH NOA – R3 STEEL POLES

 

    3. Conductors

The Procurement for the Supply and Delivery of the 2026-2027 RPH Conductor Requirements of the Member Electric Cooperatives of Region Three (PB-ITB-R3-3-2025).

This is to inform CEPALCO Energy Services Corporation (“CESCO”) that it has passed the Post-Qualification Evaluation for the procurement of the above project under the National Electrification Administration’s (NEA) Regional Procurement Hub (RPH) Program. Thus, CESCO is awarded the contract for PB-ITB-R3-3-2025 in accordance with its Total Bid Price, as follows:

📦 AWARDED ITEMS

ITEM NO. DESCRIPTION QUANTITY UNIT PRICE (PHP) TOTAL COST (PHP)
A Conductor, Bare, ACSR
#1/0, AWG 6/1 (Meters)
403,000 ₱59.90 ₱24,139,700.00
B Conductor, Bare, ACSR
#2/0, AWG 6/1 (Meters)
454,000 ₱73.75 ₱33,482,500.00
C Conductor, Bare, ACSR
#3/0, AWG 6/1 (Meters)
9,000 ₱80.00 ₱720,000.00
D Conductor, Bare, ACSR
#4/0, AWG 6/1 (Meters)
673,000 ₱117.95 ₱79,380,350.00
TOTAL BID ₱137,722,550.00

Accordingly, CESCO is required to post Performance Securities payable to the Member ECs in accordance with the forms and amounts specified under IB Clauses 21.2 of the Bidding Documents within fifteen (15) days from receipt of this Notice.

Note: Failure to provide the required Performance Securities shall constitute sufficient ground for the immediate cancellation of this award and forfeiture of the Bid Securities.

For complete details click the link below:

RPH NOA – R3 CONDUCTORS