ADVISORY FOR GCASH PAYMENT: E-RECEIPTS
? ADVISORY
ADVISORY FOR GCASH PAYMENT: E-RECEIPTS
To ensure a safe and successful ZAMECO II Bills Payment transaction using GCash, please be reminded of the following:
- ✅ Wait for the confirmation to prompt via e-Receipt before considering your transaction as complete.
This serves as your official proof of payment. - ✅ Always enter your email address correctly when prompted. This is where your e-Receipt will be sent.
- ✅ Verify thru our Check-my-Bill Feature via Messenger if your payment has been posted.
If you do not receive an e-Receipt or confirmation, do not proceed with another transaction. Instead, check your GCash app or contact GCash support for verification.
REMINDER:
GCash is a third-party payment service partnered with EC Pay; it is not controlled by ZAMECO II.
Zambales II Electric Cooperative, Inc
Bakit nawawalan ng kuryente?
| ????????? ????? ???????????? |
VS |
??????????? ????? ???????????? |
| may paunang abiso | Advisory | walang paunang abiso |
| mayroong tiyak na oras ng pagsisimula at pagtatapos | Tagal | walang kasiguraduhan sa tagal o haba ng interruption |
| mayroong itinakdang gagawin sa linya | Dahilan | hindi kontrolado gaya ng technical problem o emergencies |
| tuwing umaga/araw | Nangyayari | ano mang oras o pagkakataon |
Scheduled Power Interruption
Scheduled Power Interruption, ito ay uri ng power interruption kung saan ito ay itinakda ng ZAMECO II para sa mga naka-planong gawain. Ito ay may abiso, detalyado ang oras at tagal gayun rin ang mga apektadong lugar.
| Maintenance at Clearing Activities | NGCP Load Shifting
Preventive Maintenance |
| Relocation ng Poste at linya dahil sa Roadwidening | Mga request ng consumer/stakeholders |
Unscheduled Power Interruption
Unscheduled Power Interruption ay walang paunang abiso na mangyari ano mang oras o ano mang araw. Hindi agad matutukoy ang kabuoang apektado gayun rin ang oras o tagal ng pagbalik ng kuryente. Ito ay maaaring sanhi ng problema sa linya na bigla na lamang mangyayari o dahil sa mga emergencies.
| Animal Intrusion o Critical Vegetation | Pagkaputol o pagkasira ng linya o busted Transformer |
| Force Majeure (dahil sa panahon o pagtama ng kidlat) | Vehicular Accident
Pagsabit ng mga bagay-bagay sa linya |
RPH REGION 3 – SUPPLEMENTAL BID BULLETIN NO. 1
? RPH REGION 3 SUPPLEMENTAL BID BULLETIN NO. 1
In accordance with Section 4.3.2 of Annex “B” of the NEA Memorandum No. 2025-03, this Supplemental Bid Bulletin is hereby issued to clarify, modify or amend the following items for PB-ITB-R3-3-2025:
? DISTRIBUTION TRANSFORMERS
| Section/Item No. | Issue in the Bidding Document/ Technical Specifications | Clarification / Amendment |
|---|---|---|
| Section II. Instructions To Bidders | ||
| IB 16.1 (Schedule of Opening and Preliminary Examination of Bids) | The time for the opening of bids under IB 16.1 (i.e., 18 June 2025, 8:00 A.M.) is inconsistent with the time indicated under ITB 6 (i.e., 18 June 2025, 8:30 A.M.). | It is clarified that the correct time for the opening of bids is on 18 June 2025 at 8:30 A.M. For clarity, IB Clause 16.1 is amended to read as follows: “Opening and Preliminary Examination of bids shall be conducted face-to-face on 18 June 2025, 8:30 A.M., at the Honesty, Efficiency and Solidarity Auditorium (HESA), 2nd Floor, NEA Building, 57 NIA Road, Diliman, Quezon City.“ |
?️ STEEL POLES
| Section/Item No. | Issue in the Bidding Document/ Technical Specifications | Clarification / Amendment |
|---|---|---|
| Section VI. Checking of Eligibility Requirements and Bid Proposals | ||
| Item (B)(1) Technical Documents – Statement in matrix form of all on-going and completed government and private contracts | Inclusion of “Certification of Non-Applicability” as one of the documents to be submitted when Notice of Award and/or Notice to Proceed are not applicable. | Section VI, Item (B)(1), second paragraph, is hereby amended to read: “The Statement shall be accompanied by the following supporting documents, as applicable, for each contract declared: (a) Notice of Award (or equivalent document; if not applicable, print one page stating ‘NOT Applicable’); (b) Notice to Proceed (or equivalent document; if not applicable, print one page stating ‘NOT Applicable’); (c) Contract or Purchase Order (with terms and conditions); (d) Certificate of Acceptance/Completion; and (e) Certification of Non-Applicability if required under Bid Form No. 4.” |
⚡ CONDUCTORS
| Section/Item No. | Issue in the Bidding Document/ Technical Specifications | Clarification / Amendment |
|---|---|---|
| Section III. Form of the Contract & Section V. Terms of Reference | ||
| Contract – Sec. 7 (Total Forecast and Member ECs’ Allocation) | Typographical error: Conductor units in “pieces” instead of “meters.” | The header “Allocation Per EC” is revised to read: “Allocation/Quantity Per EC (Units in Meters).” |
| TOR 5 (General Description and Quantities of Conductors) | ||
For complete details, click the links below: