{"id":860,"date":"2025-06-04T07:40:41","date_gmt":"2025-06-04T07:40:41","guid":{"rendered":"https:\/\/zameco2.com\/?p=860"},"modified":"2025-07-11T00:31:48","modified_gmt":"2025-07-11T00:31:48","slug":"rph-region-3-supplemental-bid-bulletin-no-1","status":"publish","type":"post","link":"https:\/\/zameco2.com\/?p=860","title":{"rendered":"RPH REGION 3 &#8211; SUPPLEMENTAL  BID BULLETIN NO. 1"},"content":{"rendered":"<h2 style=\"text-align: center; color: #b71c1c; background-color: #ffebee; padding: 15px; border-radius: 8px;\">? RPH REGION 3 SUPPLEMENTAL BID BULLETIN NO. 1<\/h2>\n<p style=\"text-align: justify; font-size: 16px; line-height: 1.6; color: #333;\">In accordance with Section 4.3.2 of Annex &#8220;B&#8221; of the NEA Memorandum No. 2025-03, this Supplemental Bid Bulletin is hereby issued to clarify, modify or amend the following items for PB-ITB-R3-3-2025:<\/p>\n<h3 style=\"color: #b71c1c;\">? DISTRIBUTION TRANSFORMERS<\/h3>\n<table style=\"width: 100%; border-collapse: collapse; font-size: 15px; margin-bottom: 20px;\">\n<thead>\n<tr style=\"background-color: #f8c8c8; color: #333;\">\n<th style=\"border: 1px solid #393E46; padding: 8px; text-align: center;\">Section\/Item No.<\/th>\n<th style=\"border: 1px solid #393E46; padding: 8px; text-align: center;\">Issue in the Bidding Document\/ Technical Specifications<\/th>\n<th style=\"border: 1px solid #393E46; padding: 8px; text-align: center;\">Clarification \/ Amendment<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td colspan=\"3\"><strong>Section II. Instructions To Bidders<\/strong><\/td>\n<\/tr>\n<tr>\n<td>IB 16.1 (Schedule of Opening and Preliminary Examination of Bids)<\/td>\n<td>The time for the opening of bids under IB 16.1 (i.e., 18 June 2025, 8:00 A.M.) is inconsistent with the time indicated under ITB 6 (i.e., 18 June 2025, 8:30 A.M.).<\/td>\n<td>It is clarified that the correct time for the opening of bids is on 18 June 2025 at <strong>8:30 A.M.<\/strong> For clarity, IB Clause 16.1 is amended to read as follows: &#8220;Opening and Preliminary Examination of bids shall be conducted face-to-face on <strong>18 June 2025, 8:30 A.M., at the Honesty, Efficiency and Solidarity Auditorium (HESA), 2nd Floor, NEA Building, 57 NIA Road, Diliman, Quezon City.<\/strong>&#8220;<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3 style=\"color: #b71c1c;\">?\ufe0f STEEL POLES<\/h3>\n<table style=\"width: 100%; border-collapse: collapse; font-size: 15px; margin-bottom: 20px;\">\n<thead>\n<tr style=\"background-color: #f8c8c8; color: #333;\">\n<th style=\"border: 1px solid #393E46; padding: 8px; text-align: center;\">Section\/Item No.<\/th>\n<th style=\"border: 1px solid #393E46; padding: 8px; text-align: center;\">Issue in the Bidding Document\/ Technical Specifications<\/th>\n<th style=\"border: 1px solid #393E46; padding: 8px; text-align: center;\">Clarification \/ Amendment<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td colspan=\"3\"><strong>Section VI. Checking of Eligibility Requirements and Bid Proposals<\/strong><\/td>\n<\/tr>\n<tr>\n<td>Item (B)(1) Technical Documents &#8211; Statement in matrix form of all on-going and completed government and private contracts<\/td>\n<td>Inclusion of <strong>&#8220;Certification of Non-Applicability&#8221;<\/strong> as one of the documents to be submitted when Notice of Award and\/or Notice to Proceed are not applicable.<\/td>\n<td>Section VI, Item (B)(1), second paragraph, is hereby <strong>amended<\/strong> to read: \u201cThe Statement shall be accompanied by the following supporting documents, as applicable, for each contract declared: (a) Notice of Award (or equivalent document; if not applicable, print one page stating \u2018NOT Applicable\u2019); (b) Notice to Proceed (or equivalent document; if not applicable, print one page stating \u2018NOT Applicable\u2019); (c) Contract or Purchase Order (with terms and conditions); (d) Certificate of Acceptance\/Completion; and (e) Certification of Non-Applicability if required under Bid Form No. 4.\u201d<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3 style=\"color: #b71c1c;\">\u26a1 CONDUCTORS<\/h3>\n<table style=\"width: 100%; border-collapse: collapse; font-size: 15px; margin-bottom: 20px;\">\n<thead>\n<tr style=\"background-color: #f8c8c8; color: #333;\">\n<th style=\"border: 1px solid #393E46; padding: 8px; text-align: center;\">Section\/Item No.<\/th>\n<th style=\"border: 1px solid #393E46; padding: 8px; text-align: center;\">Issue in the Bidding Document\/ Technical Specifications<\/th>\n<th style=\"border: 1px solid #393E46; padding: 8px; text-align: center;\">Clarification \/ Amendment<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td colspan=\"3\"><strong>Section III. Form of the Contract &amp; Section V. Terms of Reference<\/strong><\/td>\n<\/tr>\n<tr>\n<td>Contract &#8211; Sec. 7 (Total Forecast and Member ECs\u2019 Allocation)<\/td>\n<td>Typographical error: Conductor units in \u201cpieces\u201d instead of \u201cmeters.\u201d<\/td>\n<td>The header \u201cAllocation Per EC\u201d is revised to read: \u201cAllocation\/Quantity Per EC (Units in <strong>Meters<\/strong>).\u201d<\/td>\n<\/tr>\n<tr>\n<td>TOR 5 (General Description and Quantities of Conductors)<\/td>\n<td><\/td>\n<td><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p style=\"font-size: 15px; color: #444; line-height: 1.6; text-align: justify;\"><strong>For complete details, click the links below:<\/strong><\/p>\n<p style=\"margin-top: 10px; text-align: left;\"><a style=\"color: #d32f2f; font-weight: bold; text-decoration: none;\" href=\"https:\/\/zameco2.com\/wp-content\/uploads\/2025\/06\/RPH-SBB-No.-1-for-Region-3-Distribution-Transformers-PB-ITB-R3-1-2025_4d2911a1-9d2f-470b-9b96-811cf185fa77.pdf\" target=\"_blank\" rel=\"noopener\">RPH-SBB No. 1 &#8211; Distribution Transformers<\/a><\/p>\n<p style=\"margin-top: 10px; text-align: left;\"><a style=\"color: #d32f2f; font-weight: bold; text-decoration: none;\" href=\"https:\/\/zameco2.com\/wp-content\/uploads\/2025\/06\/RPH-SBB-No.-1-for-Region-3-Conductors-PB-ITB-R3-3-2025_cdfa7382-398e-4566-b7aa-b2dd326f5589.pdf\" target=\"_blank\" rel=\"noopener\">RPH-SBB No. 1 &#8211; Conductors<\/a><\/p>\n<p style=\"margin-top: 10px; text-align: left;\"><a style=\"color: #d32f2f; font-weight: bold; text-decoration: none;\" href=\"https:\/\/zameco2.com\/wp-content\/uploads\/2025\/06\/RPH-SBB-No.-1-for-Region-3-Steel-Poles-PB-ITB-R3-2-2025_65cfa167-1091-4e36-9e01-56400af412cb.pdf\" target=\"_blank\" rel=\"noopener\">RPH-SBB No. 1 &#8211; Steel Poles<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>? RPH REGION 3 SUPPLEMENTAL BID BULLETIN NO. 1 In accordance with Section 4.3.2 of Annex &#8220;B&#8221; of the NEA Memorandum No. 2025-03, this Supplemental Bid Bulletin is hereby issued to clarify, modify or amend the following items for PB-ITB-R3-3-2025: ? DISTRIBUTION TRANSFORMERS Section\/Item No. Issue in the Bidding Document\/ Technical Specifications Clarification \/ Amendment [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":861,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_uag_custom_page_level_css":"","footnotes":""},"categories":[7,9,23],"tags":[],"class_list":["post-860","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-announcement","category-bids","category-regional_procurement_hub"],"uagb_featured_image_src":{"full":["https:\/\/zameco2.com\/wp-content\/uploads\/2025\/06\/TEMPLATE-1.png",1550,1080,false],"thumbnail":["https:\/\/zameco2.com\/wp-content\/uploads\/2025\/06\/TEMPLATE-1-150x150.png",150,150,true],"medium":["https:\/\/zameco2.com\/wp-content\/uploads\/2025\/06\/TEMPLATE-1-300x209.png",300,209,true],"medium_large":["https:\/\/zameco2.com\/wp-content\/uploads\/2025\/06\/TEMPLATE-1-768x535.png",768,535,true],"large":["https:\/\/zameco2.com\/wp-content\/uploads\/2025\/06\/TEMPLATE-1-1024x713.png",1024,713,true],"1536x1536":["https:\/\/zameco2.com\/wp-content\/uploads\/2025\/06\/TEMPLATE-1-1536x1070.png",1536,1070,true],"2048x2048":["https:\/\/zameco2.com\/wp-content\/uploads\/2025\/06\/TEMPLATE-1.png",1550,1080,false]},"uagb_author_info":{"display_name":"Jehu Recaido","author_link":"https:\/\/zameco2.com\/?author=7"},"uagb_comment_info":0,"uagb_excerpt":"? RPH REGION 3 SUPPLEMENTAL BID BULLETIN NO. 1 In accordance with Section 4.3.2 of Annex &#8220;B&#8221; of the NEA Memorandum No. 2025-03, this Supplemental Bid Bulletin is hereby issued to clarify, modify or amend the following items for PB-ITB-R3-3-2025: ? DISTRIBUTION TRANSFORMERS Section\/Item No. Issue in the Bidding Document\/ Technical Specifications Clarification \/ Amendment&hellip;","_links":{"self":[{"href":"https:\/\/zameco2.com\/index.php?rest_route=\/wp\/v2\/posts\/860","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zameco2.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zameco2.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/zameco2.com\/index.php?rest_route=\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/zameco2.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=860"}],"version-history":[{"count":16,"href":"https:\/\/zameco2.com\/index.php?rest_route=\/wp\/v2\/posts\/860\/revisions"}],"predecessor-version":[{"id":1205,"href":"https:\/\/zameco2.com\/index.php?rest_route=\/wp\/v2\/posts\/860\/revisions\/1205"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zameco2.com\/index.php?rest_route=\/wp\/v2\/media\/861"}],"wp:attachment":[{"href":"https:\/\/zameco2.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=860"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zameco2.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=860"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zameco2.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=860"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}